YEKA G25 50 MW BOLU SPP,
TM and EİH EPC
The transformer substation and 154 kV power transmission line constructed as part of the 50 MW solar power plant project implemented in Gerede, Bolu, offer an integrated solution that strengthens the region's energy infrastructure with a holistic approach. The transformer substation ensures the safe and efficient transfer of energy production to the system, while the control systems are established with the goal of high efficiency and operational continuity.
The 154 kV power transmission line, approximately 20 km long, constructed in the challenging geographical and climatic conditions of Mount Bolu, increases the transmission capacity of the region with high-capacity conductors and durable line components, enabling uninterrupted and reliable energy flow. Together, these two structures form critical links in the energy chain from production to transmission, ensuring the project achieves a sustainable and robust infrastructure.

PROJE KÜNYESİ
Proje Adı:
YEKA G25 50 MW BOLU SPP,
TM and EİH EPC
Konum:
Bolu - Gerede
Faaliyet Tarihi:
2026
Kapsam:
TM - EİH
Kapasite:
50 MW / 154 kV
Ecogreen Energy
Yatırımcı / İşbirliği:
Diğer:
- 154kV Transformer Substation Construction Project (EPC) (1 line feeder, 1 transformer feeder, 1 transfer feeder)
- 36kV Metal Clad Switchgear (EPC)
- Control and monitoring buildings (EPC)
- 154 kV Line Feeder Equipment Installation Project (Gerkonsan OSB TM)
- 154 kV (20km) 1272 MCM Conductor Power Transmission Line (EPC)