top of page

KALYON ENERGY
154 kV POWER TRANSMISSION LINE and TM ADDITIONAL LINE FEEDER
Kalyon Enerji participated in the 154 kV power transmission line and 154 kV Bor Transformer Substation additional line feeder project in Bor district of Niğde. In this project, the engineering, procurement and construction (EPC) processes of the power transmission line and transformer substation were successfully completed.

PROJE KÜNYESİ
Proje Adı:
KALYON ENERGY
154 kV POWER TRANSMISSION LINE and TM ADDITIONAL LINE FEEDER
Konum:
Niğde - Bor
Faaliyet Tarihi:
2021
Kapsam:
TM - EİH
Kapasite:
154 kV - 13.3 km line
Kalyon Energy
Yatırımcı / İşbirliği:
Diğer:
-