GÜRPINAR GEDİK 50 MW SOLAR POWER PLANT, SUBSTATION AND ENERGY TRANSMISSION LINE EPC
This is a comprehensive solar power plant project that contributes to the region's electricity transmission capability with its high-voltage transformer substation, switchgear, and power transmission line infrastructure. Control and monitoring structures within the project site have been planned with an integrated systems approach.

PROJE KÜNYESİ
Proje Adı:
GÜRPINAR GEDİK 50 MW SOLAR POWER PLANT, SUBSTATION AND ENERGY TRANSMISSION LINE EPC
Konum:
Van - Gürpınar
Faaliyet Tarihi:
2026
Kapsam:
GES - TM - EİH
Kapasite:
50 MW - 54kV Transformer Substation
Asaş Aluminum
Yatırımcı / İşbirliği:
Diğer:
- 154kV Transformer Substation Construction Project (EPC) (2 line feeders, 1 transformer feeder, 1 transfer feeder)
- 36kV Metal Clad Switchgear (EPC)
- Control and monitoring buildings (EPC)
- 154 kV (3 + 3 km) 1272 MCM Conductor Power Transmission Line (EPC)