top of page

GÜRPINAR GEDİK 50 MW SOLAR POWER PLANT, SUBSTATION AND ENERGY TRANSMISSION LINE EPC

This is a comprehensive solar power plant project that contributes to the region's electricity transmission capability with its high-voltage transformer substation, switchgear, and power transmission line infrastructure. Control and monitoring structures within the project site have been planned with an integrated systems approach.

PROJE KÜNYESİ

Proje Adı:

GÜRPINAR GEDİK 50 MW SOLAR POWER PLANT, SUBSTATION AND ENERGY TRANSMISSION LINE EPC

Konum:

Van - Gürpınar

Faaliyet Tarihi:

2026

Kapsam:

GES - TM - EİH

Kapasite:

50 MW - 54kV Transformer Substation

Asaş Aluminum

Yatırımcı / İşbirliği:

Diğer:

- 154kV Transformer Substation Construction Project (EPC) (2 line feeders, 1 transformer feeder, 1 transfer feeder)
- 36kV Metal Clad Switchgear (EPC)
- Control and monitoring buildings (EPC)
- 154 kV (3 + 3 km) 1272 MCM Conductor Power Transmission Line (EPC)

bottom of page