EŞME YEŞİLKAVAK 45 MW SOLAR POWER PLANT, TM AND TEİAŞ CONNECTION EPC

Supported by modern transmission line infrastructure and high-voltage switchgear systems, this solar power plant investment has been designed in line with sustainable energy goals. It offers a multi-component structure, including a line feeder connected to the TEİAŞ headquarters.

PROJE KÜNYESİ

Proje Adı:

EŞME YEŞİLKAVAK 45 MW SOLAR POWER PLANT, TM AND TEİAŞ CONNECTION EPC

Konum:

Uşak - Eşme

Faaliyet Tarihi:

2026

Kapsam:

GES - TM - EİH

Kapasite:

45 MW - 154kV Transformer Substation

Asaş Aluminum

Yatırımcı / İşbirliği:

Diğer:

- Construction of a 154kV Transformer Substation (EPC) (1 line feeder, 1 transformer feeder, 1 transfer feeder)
- 36kV Metal Clad Switchgear (EPC)
- Control and monitoring buildings (EPC)
- 154 kV (3 km) 1272 MCM Conductor Power Transmission Line (EPC)
- Equipping the power transmission line feeder (at 154kV Mescier TM)