DINAR GENCALI 62 MW SOLAR POWER PLANT, TM and TEİAŞ CONNECTION EPC

The Tarof power plant, integrated with the transmission line and TEİAŞ (Turkish Electricity Transmission Corporation) counterparty connections, is designed to support the region's renewable energy capacity. The switchyard and control structures in the project were also constructed using the EPC (Engineering, Procurement, and Construction) model.

PROJE KÜNYESİ

Proje Adı:

DINAR GENCALI 62 MW SOLAR POWER PLANT, TM and TEİAŞ CONNECTION EPC

Konum:

Afyon - Dinar

Faaliyet Tarihi:

2026

Kapsam:

GES - TM - EİH

Kapasite:

62 MW - 54kV Transformer Substation

Asaş Aluminum

Yatırımcı / İşbirliği:

Diğer:

- 154kV Transformer Substation Construction Project (EPC) (1 line feeder, 1 transformer feeder, 1 transfer feeder)
- 36kV Metal Clad Switchgear (EPC)
- Control and monitoring buildings (EPC)
- 154 kV (3 km) 1272 MCM Conductor Power Transmission Line (EPC)
- Equipping the EIH counter-substation line feeder (at TEİAŞ's 154kV Dinar TM)