The BMS Steel Solar Power Plant project, implemented in Kırşehir, makes a significant contribution to sustainable energy production with its installed capacity of 6.24 MWp / 5.00 MWe. As part of the EPC (Engineering, Procurement, and Construction) project, the construction of the solar power plant, as well as the installation of a 36 kV overhead line and distribution center, have been successfully completed. Built in accordance with IEC standards, the facility offers environmentally friendly solutions with its carbon emission reduction, and serves as a strong example of high efficiency and sustainability goals in the energy sector.

PROJE KÜNYESİ

Proje Adı:

BMS STEEL
6.24 MWp / 5.00 Mwe
SPP - EPC

Konum:

Kırşehir

Faaliyet Tarihi:

2024

Kapsam:

GES

Kapasite:

6.24 / 5.00 (MWp/MWe)

BMS United Metal

Yatırımcı / İşbirliği:

Diğer:

9,600 MWh Annual Electricity Production